Earthworks can produce sediment-laden runoff when exposed soil is disturbed by rainfall. Standard erosion and sediment controls are often used to slow this water and allow suspended soil particles to settle before discharge.
On some sites, however, very fine particles can remain suspended for long periods and may not settle effectively through physical controls alone.
Chemical treatment can be used in these situations to improve sediment removal and help reduce the amount of fine material leaving the site.
It is not required for every development. Whether treatment is appropriate depends on the soil, scale of earthworks, receiving environment and the performance expected from the wider sediment-control system.
Not all soils behave in the same way when mixed with water.
Larger particles such as sand tend to settle relatively quickly, while finer particles such as silt and clay can remain suspended for much longer. This can leave runoff looking cloudy even after it has passed through a sediment pond or other control device.
The problem can be more noticeable on sites with fine-grained soils or where large areas of ground are exposed at the same time.
Understanding how the soil behaves is therefore an important part of deciding whether standard controls are likely to be enough.
Chemical treatment encourages very small suspended particles to bind together into larger groups, making them easier to settle or remove from the water.
The treatment is normally used alongside physical sediment controls rather than replacing them.
Runoff still needs to be captured and managed appropriately, but chemical treatment can improve the performance of the system where fine sediment would otherwise remain suspended.
A chemical treatment management plan can set out how treatment should be applied, monitored and adjusted throughout the earthworks period.
Chemical treatment may be considered where the characteristics of the site make standard sediment controls less effective.
This can include situations where:
The decision should be based on the actual conditions of the site rather than treating chemical dosing as a standard requirement for every project.
Chemical treatment works best as one part of a wider strategy.
Reducing erosion in the first place remains important. Clean water should be diverted away from disturbed areas where possible, exposed ground should be limited and completed sections should be stabilised as work progresses.
Physical sediment controls then capture runoff from active earthworks.
Where fine material is still difficult to remove, chemical treatment can provide an additional layer of treatment.
This is why it should be coordinated with the overall erosion and sediment control approach rather than designed separately.
The appropriate treatment method depends on how the site runoff responds to different products and dosing levels.
Testing may be carried out to understand how effectively the soil settles and what treatment rate produces the desired result.
Using too little treatment may not achieve the required level of sediment removal, while excessive dosing can also create problems.
The objective is to apply enough treatment to improve settling while maintaining appropriate water quality before discharge.
Conditions on an earthworks site change constantly.
Rainfall intensity, exposed soil area, construction staging and the volume of runoff entering a treatment system can all vary over time.
A chemical treatment system therefore needs to be monitored rather than simply installed and left unchanged.
Checks may include the appearance and clarity of treated water, dosing performance, treatment equipment, discharge conditions and the effectiveness of the wider sediment controls.
If site conditions change, the treatment approach may need to be adjusted.
The amount of disturbed land on a site can have a direct effect on how much sediment is generated.
If a large development is opened all at once, the treatment system may need to manage significantly more runoff than if earthworks are staged.
As areas are completed and stabilised, the amount of exposed soil can reduce and treatment requirements may change.
Planning construction stages alongside sediment and chemical treatment can therefore improve both the practicality and performance of the system.
Heavy rainfall can place significant pressure on erosion and sediment controls.
More water moves through the site, sediment concentrations can increase and treatment devices may receive runoff more quickly than during smaller events.
Chemical treatment needs to operate within this changing environment.
This makes appropriate storage, dosing and monitoring particularly important during periods of unsettled weather, when the risk of sediment leaving the site can be greatest.
Chemical treatment often depends on infrastructure that needs space, access and suitable flow paths.
Leaving these requirements until construction has already started can make it harder to establish an effective system.
Early planning allows treatment to be coordinated with sediment ponds, diversion channels, earthworks staging and discharge locations.
It can also help identify whether chemical treatment is likely to be needed before the site is fully opened up.
Civix provides chemical treatment planning for subdivision, land development and infrastructure projects where earthworks runoff requires additional sediment management.
The treatment approach can be coordinated with the wider erosion and sediment control strategy, helping account for soil behaviour, site layout, construction staging and monitoring requirements throughout the earthworks period.
Earthworks are often one of the first major stages of a subdivision or land development project. They involve reshaping the existing ground so the site can support buildings, accessways and other future construction.
READ MOREEngineering approval is the stage where detailed civil plans are reviewed before construction begins. It is commonly required for subdivisions and developments involving earthworks, roads, accessways, drainage or connections to public infrastructure.
READ MOREFlood-related constraints can affect where buildings are placed, how high finished floor levels need to be and how stormwater is managed across a development site.
READ MOREAccess design affects how safely and easily vehicles can enter, leave and move around a property. It can also influence the wider layout of a subdivision or development, including building placement, earthworks and service connections.
READ MORESite services are the systems that allow a development to connect with essential infrastructure. For most subdivision and land development projects, this includes water supply, wastewater disposal and stormwater management.
READ MOREEarthworks can significantly change the way water moves across a development site. Once vegetation is cleared or soil is exposed, rainfall can loosen and carry sediment into stormwater networks, neighbouring properties, streams and other receiving environments.
Flood risk is not always obvious when looking at a property. A site may remain dry in normal conditions but still sit within a flood-prone area or carry significant surface water during heavy rainfall.
READ MOREStormwater treatment is an important part of many subdivision, land development and infrastructure projects. As sites are developed, buildings, roads, car parks and other hard surfaces can increase the volume and speed of runoff while also changing the types of contaminants entering the stormwater system.
Development usually increases the amount of hard surface on a property. Roofs, driveways, roads and paved areas prevent rainfall from soaking naturally into the ground, which can increase the volume and speed of stormwater runoff.
Earthworks can produce sediment-laden runoff when exposed soil is disturbed by rainfall. Standard erosion and sediment controls are often used to slow this water and allow suspended soil particles to settle before discharge.
For private land developments, Civix Town Planners, Chartered Engineers and Licensed Cadastral Surveyors have got you covered from the initial site visit through to council sign off.